欢迎进入 投资云南@云南招商网

州市招商

文山

项目查询

关键字:
所属行业:
投资金额:
- 万元
 
您现在的位置是: 首页--新材料--详细
纳米超级电容新能源电池项目Nanometer Super-capacitor Battery Project
发布时间:2017-07-12 17:27:39   来源:本站   作者:   点击:111次
 

Name

纳米超级电容新能源电池项目
Nanometer Super-capacitor Battery Project

Industry Involved

New materials

Site

Qilin Zone of Anning Industrial Park

Description

The super-capacitor is a kind of new energy storage device with large capacitance and strong capacity of charge retention. The device can be charged quickly and is easy to use without pollution. It can be widely used in new energy automobile, computer, communication, electricity, aviation, spaceflight, national defense, etc. In this project, enterprises producing super-capacitors will be brought in to invest in and establish factories in the park, so as to form an industry scale with an annual assembly of 20,000,000 nanometer super-capacitors.

Content

Construction scale: The total floor area is 42640.2 m2. Detailed construction includes the batching area, coating area, rolling area, cutting area, winding area, assembly area, pouring area, testing area, packaging area, raw material warehouse, finished goods warehouse, comprehensive office building, life service area and public facilities. An industry scale with an annual assembly of 18,000,000 super-capacitor monomers and 2,000,000 super-capacitor modules will be formed after this project is completed.

Construction duration: 3 years

Land area: 68.7 mu

Supporting Conditions

Located in the west of Anning City, Anning Industrial Park covers the administrative areas of Caopu Subdistrict, Qinglong Subdistrict and Lubiao Subdistrict. It covers a total area of 395.26 km2, 192.63 km2 of which is the key construction area. Anning Industrial Park is one of the 30 key industrial parks included in the Development Outline for New-type Industrialization in Yunnan Province and is listed in the first batch of “China's 50 good investment zones for safety and good faith” in Yunnan Province. It was listed as the provincial industrial park in August 2010. The controlled detailed planning for Qilin Zone in Anning Industrial Park has been completed at present. The total planning area is 661.14 ha and is divided into “one center, two axes and five clusters”. “One center” refers to the comprehensive service center in the planning area; “two axes” refer to the spatial “cross” shape formed by the Industrial Avenue and the Modern Avenue in the area; “five clusters” refer to the high-tech industry cluster in the north, the industrial clusters in the west and east, the logistics service cluster and the supporting service cluster. In 2014, there were 87 industrial enterprises above the designated size, increasing by 15 over the end of 2010; the industrial fixed-assets investment was RMB 11,349,000,000, with an increase of 228% compared with that at the end of 2010; the main business revenue above the designated size was RMB 49,600,000,000, up by 342.8% compared with that at the end of 2010.

Investment Estimate and Fund Raising

Investment estimate: a total investment of RMB 629,344,000 including RMB 229,344,000 of self-raised funds and RMB 400,000,000 of funds raised from financial institutions

Fund raising: self raising by enterprise and bank loans

Preferential Policies Applicable

In addition to the preferential policies issued by the country and Yunnan Province, this project benefits from the support and incentives for investment promotion offered by Anning City for providing enterprises with preferential policies on industry development fund and project support and reward.

Market Prediction (Analysis)

The super-capacitor, namely the electrochemical capacitor, is a new electric energy storage component with light mass, high functional density, long cycle life, fast charge and discharge speed and no pollution to the environment. It is used in the green energy, industrial electronic, power electronic, transportation, etc. The market scale of global super-capacitor was USD 1,100,000,000 in 2014. The global market scale of super-capacitor is expected to reach USD 3,200,000,000 in 2018 with an annual compound growth rate of 31%. In 2013, China's market scale of super-capacitor increased to RMB 1,920,000,000 from RMB 700,000,000 in 2009 with an annual growth rate of 32.51%. It is expected to reach RMB 3,380,000,000 in 2016 with an annual growth rate of 22.08%. For super-capacitors, the technology and performance of some products in China are not as good as that of products of foreign companies at present, but the gap has been gradually narrowed, especially for the winding-type and large-sized super-capacitors, and the technology of these products is approaching international level and some performance even exceeds that of similar products abroad. For industrialization, some companies in the US, Japan, Russia, Switzerland, South Korea and France have taken the leading position through years of research and development and technology accumulation. Such companies include Maxwell in the US, NEC, Panasonic and Tokin in Japan and Econd in Russia and they have dominated most of the global markets at present.

Profit Model and Preliminary Benefit Analysis

Economic benefits: After this project reaches the design capacity, the sales revenue of super-capacitor monomers and super-capacitor modules will reach RMB 850,000,000 with the corporate income tax of RMB 60,181,000, and annual net profit of RMB 180,543,000 and the payback period is 6.4 years.

Social benefits: The construction of this project will promote the development of new energy industry in Anning City and increase job opportunities.

Risk Analysis

The amount of investments and loans for this project is relative large, so certain financial risks exist. The enterprise(s) shall accelerate the process for commissioning of this project to generate profits as soon as possible and shall improve profitability and reduce investment risks. Because relevant subsidy policies for super-capacitor have not been issued by the country, there are certain disadvantages of super-capacitors in terms of market price compared with other power batteries.

Cooperation Pattern

Joint venture and equity participation

Contact Information

Contact Unit: Anning Development and Reform Bureau (Municipal Investment Promotion Bureau)

Contact Person: Cao Chun

Tel.: 0871-8697819, 8697618

Fax: 0871-8699816

E-mail: an_fazhan@126.com

关于我们| 商会平台| 信息公开| 联系我们 滇ICP备08002862号

0871-67195654/67195610

电子邮件:yunnanzs@163.com

云南招商官方微信

法制在线官方微信

管理员登录      不良信息报警      云南网监      网站备案      平台入口      招商大数据平台项目查询系统